DECISION Nr.942, dated on 17.11.2010 On approval of procedures and documentation for obtaining permits MINING IN OPEN AREAS
DECISION
No.942, dated on 17.11.2010
APPROVAL PROCEDURES AND DOCUMENTATION FOR OBTAINING
MINING PERMITS IN OPEN AREAS
Pursuant to Article 100 of the Constitution and article 29, paragraphs 1 and 11, 30 and 56, paragraph 1, of Law No. 10 304, dated 15.07.2010 “On the mining sector in the Republic of Albania”, the proposal of the Deputy of the Minister of Economy, Trade and Energy, the Council of Ministers
DECIDED:
- In an application for mining permits in the open areas, the surface area required shall be
located within the areas to open areas published as annual mining plan.
- Complete documentation of the application for a mining permit submitted to the National Center
Licensing (QKL) and the application date announced by the center.
3.QKL electronically forwards the Ministry of Economy, Trade and Energy full documentation of the mining license application and enables access to this documentation to review institutions, the National Agency of Natural Resources (AKBN) and Albanian Geological Survey (SHGJSH).
- Evaluation of conditions permitting and review of documents corroborating the requirements the prospecting mining license groups metallic minerals, non-metallic, coal and bitumen; for the mineral construction and radioactive minerals group, carried out by Albanian Geological Survey (SHGJSH), and requirements;
- For mineral permits for groups of metallic minerals, non-metallic, coal and bitumen; for the mineral construction; for group of radioactive minerals and exploration permits for the group-exploitation of minerals precious and semi-precious, conducted by the National Agency of Natural Resources (AKBN).
- Drafting the approval of the mining permit is carried by the respective department covering the mining ministry in Albania and then approved by Minister.
- Review of applications for mining permits for open areas made on the basis of the principle “of first in time, first in right “, and the act of approval of the Minister given entity has applied the first and fulfill the conditions of admission and documentation under section 10 of this decision.
- The entities applying for a mining permit exploration, exploitation or search/discovery, along with the documentation file for mining permits are required to declare in writing the legal source of all geological information or geological-mining, the documentation used in the construction of the applicant.
- Application for a mining permit or mining permit use search and discovery/use it prevails over a permit application for the prospecting.
- Requests submitted, those in process or pending, in the sense of Article 57 of the law No. 10 304, dated 01.07.2010 “On the mining sector in the Republic of Albania” will be called requirements that have conducted environmental permit application and approved by the institution of AKBN project development of mining activities, prior to the entry into force of law above.
- Detailed conditions and supporting documents to ensure the fulfillment of these conditions to be met by the applicant for a mining permit and treatment procedures requirements with the terms defined as follows:
- The application for the prospecting license for the group of metal ores, non-metallic, coal
and bitumen, as well as construction minerals group and the group of radioactive minerals.
A.1 application with complete documentation for a mining permit is made to the research and discovery
QKL counters. Date of application of the full documentation is the date of the calculation period to tacit approval.
8650
Full documentation includes:
- a) An extract of the decision of the National Registration Centre (QKR) for registration as legal person, where the object of the activity have approved the development of the activity surface mining or underground works as required.
- b) A description of the technical, professional and managerial capabilities of the applicant, which to the applicant for the business of the exploration, including Curriculum Vitae of its staff that will work for this activity, as well as a description of his experience previous in the mining industry, if any.
- c) Contract with the technical director of works, notarized, which should be engineer mining operations, the scope of exploration under the names of universities, certified by relevant diploma.
- d) One of the necessary financial resources for the realization of investments programmed for develop mining activities in exploration and / or by verifying the existence thereof, as follows:
- i) A statement from the bank confirming that a person has opened the account number, where this stored at least 20% of the investment envisaged in the investment program who submitted;
- ii) A document certifying that a person has obtained a loan from a bank, or another financial entity value, which covers investments foreseen to be committed;
iii) A contract with an investor, which provides financial support for the implementation of investment program. In this case, the legal entity must submit a notarized document in which he expresses the desire of investors to support this investment, as well as documents proving financial resources of the latter (bank guarantee or the economic balance of the company, in which investor is the owner / sole shareholder, or shareholder of majority ownership of shares / primary majority).
- d) Project development of mining operations, exploration and the minimum program job search and discovery, which must contain:
- i) descriptive forms of mining area that features a scale topographic map
1: 25,000 of the area looking for the prospecting permit, the outline drawn on the map, coordinates State plan and its surface.
- ii) Specification of mineral or minerals for which a permit is required, pursuant to Annex 1, attached to this decision;
iii) A brief description Geographical economic zone looking for permission of search/discovery (landscape, climate, vegetation, hydrography, hydrogeology, economy, demographics, infrastructure).
- iv) A brief description of the construction geological-tectonic area of study data archival, coupled with its geological map scale (1:10 000-1: 50 000), History studies and works carried out, their results.
- v) A description of useful minerals in the area of data archival description complete mineral or minerals for which a permit is required. Sources and familiar objects by exploration works, fields used or occupied. Known reserves by fields and buildings, their quantity and quality.
- vi) the proposed method of mineral exploration.
vii) A description of the exploration program of the proposed studies and works, the designed in the area looking for the prospecting permit, the stages of their implementation under terms (search works, works discovery), according to their kinds (Geological Oceanography, geophysics). For research work and intelligence programmed must study:
– Be accompanied by technical project for each of the squares, fields or facilities where designed, indicating the argument, type and volume of works and it works, information on costs, timing of programmed realization.
– Illustrated with graphic material, such as maps, projections, profiles etc. the degree required for each site, source, object and paper designed to permit application stage for search/discovery.
8651
viii) A minimum program of exploration work proposed to be carried out in whole and mining permit for each site, source and object; with the voices of the works programmed their volume, expenditure programmed for each sound and whole. The minimum work program of programmed for each year of work of the mining permit.
- ix) The definitions of the values of financial guarantees for the implementation of the minimum work program and implementation of the rehabilitation plan of the mining area.
- x) Minimum work program proposed exploration license should not be more smaller in value than the required product surface to permit a certain monetary value of spent for every square kilometer of area, this according to the table set with decision Council of Ministers (Article 14, paragraph 4, of the mining law).
- f) Project of rehabilitation of the mining area, which includes:
- i) project activities closing
- ii) waste management project mining
iii) rehabilitation project of progressive and final mining area.
A.2 Verify Albanian Geological mining area requested, prepares an verification, according to the form specified in Annex 2 attached to this decision, carries peer review and technical council project examines the development of mining operations search and discovery, the minimum program for research and discovery work, the project of rehabilitation mining area and settings for the values of financial guarantees for the implementation of the minimum program work and implementation of the rehabilitation plan of the mining area, and to the Ministry of Economy, Trade and Energy no later than 45 (forty five) calendar days after the date of application NLC decision of approval or disapproval of the technical council signed by sthe institution and the secretary of the technical committee.
A.3 Minister within a period of 90 (ninety) days from the date of application the QKL issued the act of approval or refusal to permit exploration and guarantees financial resources to meet the minimum work program and implementation of the rehabilitation plan mining area. Within this period, the entity must be provided with the relevant environmental permit covering mining area requested. In case of not issuing this license, the Minister issues an act of refusal device with a mining permit.
A.4 exploration permits for radioactive minerals group approved by the Council of Ministers on the proposal of the Minister that the mining activities. In this case, does not apply silence is consent.
A.5 applicant notified of the approval or rejection by publication in the Register Permits and Licenses National.
- Request for permission to use the group of metallic minerals, non-metallic, coal and bitumen; Construction Minerals group, the group of radioactive minerals and for permission exploration-exploitation of precious minerals group and semi-precious.
B.1. The application with complete documentation for a mining license or permit usage research and discovery-mining exploitation, becomes the counters of NLC. Date of full application documentation is the date of the calculation period for tacit approval.
Full documentation includes:
- a) An extract of the decision of the National Registration Centre (NRC) for registration as legal person, where the object of the activity of this approved the development of the activity surface mining or underground works as required;
- b) A description of the technical, professional and managerial capabilities of the applicant, the valid for the realization of the exploitation or exploration-exploitation, including Curriculum Vitae and his staff will work for this activity, as well as description of his previous experience in the mining industry, if any;
- c) Contract with the technical director of works, notarized, which should be engineer the scope of the mining exploitation activities under the names of universities, certified by relevant degree;
8652
- d) The financial resources necessary for the realization of investments programmed for develop the mining exploitation or exploration-exploitation and certificates for their existence may be as follows:
- i) A statement from the bank to confirm that a person has opened the account number, where there should be deposited at least 20% of the investment value as defined by program investments presented.
- ii) A document certifying that a person has obtained a loan from a bank or other financial entity, securities, which covers investments envisaged to be carried out.
iii) A contract with an investor, which provides financial support for the implementation of investment program. In this case the legal entity must submit a notarized document in which he expresses the desire of investors to support this investment, as well as documents proving financial resources of the latter (bank guarantee or the economic balance of the company, in which investor is the owner / sole shareholder, or shareholder of majority ownership of shares / primary majority).
- d) Project development of mineral exploitation activities or search discovery/exploitation and the investment program for use, which should contain:
- i) Forms descriptive mining area that contains a topographic map, scale 1: 25000, the area required for exploitation permit or exploration-exploitation, contour, drawing Location, State plans and coordinates its surface.
- ii) Specification of minerals or mineral groups, for which a permit is required, according to Annex 3 attached to this decision.
iii) A survey of the area plan is required, with corresponding coordinates plans, buildings or any other existing object within the area.
- iv) A brief description Geographical economic zone looking for permission for search/discovery (landscape, climate, vegetation, hydrography, hydrogeology, economy, demographics,
infrastructure).
- v) A brief description of the construction geological-tectonic area of study/archive date, coupled with its geological map, scale (1:10 000-1: 50,000), history studies of the work performed, the results.
- vi) A description of useful minerals in the area of archive data or results exploration, full description of the mineral or minerals for which a permit is required for fields and facilities recognized by the exploration works for fields used or used for reserves recognized by fields and facilities, the amount of quality them. The study illustrated with graphic material, such as maps, projections, profiles, etc., To the extent appropriate for each site, source, object and paper designed to permit application stage exploitation or exploration-exploitation.
vii) the proposed manner of use and / or processing of minerals.
viii) A description of the program of mining and / or processing proposed to conduct involving a work plan, deadlines, together with estimated expenses to be incurred for its implementation, the proposed methods work.
- ix) An investment plan proposed work to be performed, which includes a work plan, deadlines, the together with projected expenditures for this program of investment that should be assessed by responsible structures and approved by the Minister. The investment value of the guarantee must be assessed structures responsible and approved by the Minister.
- x) detailed program of mining and / or processing proposed to be carried out, includes data on ore that will be required, the proposed working methods, tools that will they used the deadlines for the development of works and investments for the implementation of the program; forecasts detailed capital investment, labor costs, income and the estimated financial resources.
- xi) the detailed work program for the case where further processing of ore, for facilities to be built, for the treatment of minerals, the indicators scheme processing.
8653
xii) Technical Report on the use, treatment of minerals with value growth opportunities their Albania and purpose of the applicant in relation to them.
xiii) Particulars of the proposed mining operations, including:
– The estimated production capacity with the escalation of labor operations;
– The types of products;
– Proposals on pollution prevention, treatment sterile, protection of natural resources, progressive reclamation and rehabilitation of damaged land caused by mining exploitation and to minimize the effects of mining on surface water, water groundwater and adjacent land areas in the permitted area;
– Effects that may occur on the environment from mining operations and proposals minimize them;
– Any special risk (health or otherwise) that may arise during use minerals and proposals to control and eliminate them.
- f) specification of its proposals for employment and qualification of its citizens.
- e) specifications for potential infrastructure requirements and precautions to be undertaken, including, but not only, method of entry into the area allowed for mineral exploitation.
- h) Rehabilitation Project of the mining area, which includes:
- i) closing the project activities;
- ii) waste management project mining;
iii) rehabilitation project of progressive and final mining area.
- f) The definitions for the values of financial guarantees for the implementation of the minimum work program and implementation of the rehabilitation plan of the mining area.
B.2 AKBN looking verifies mining area and prepares an attestation by the form specified in Annex 4, attached to this decision, performs peer review, technical committee examines project development activities or mineral exploitation exploration-exploitation, the investment program for the use or search zbulimshfrytëzimin, the project of rehabilitation of the mining area and provisions for guarantees values for implementing the investment program and the implementation of the rehabilitation plan of the area mining and to the Ministry of Economy, Trade and Energy no later than 60 (sixty) calendar days after the date of application to the NLC, the decision of approving or not technical council, signed by the institution and the secretary of the council.
B.3 Minister within a period of 120 (one hundred twenty) days from the date of QKL application, issue the act of approval or refusal to permit use, search, exploitation and financial guarantees for the implementation of the minimum work program and the implementation of Rehabilitation plan of the mining area. Within this period, the undertaking must obtain permission Environmental relevant required covering mining area. In case of not issuing with this license, Minister issues an act of rejection and issue mining.
B.4 permits exploitation of radioactive minerals group, approved by the Council of Ministers, on the proposal of the minister responsible for mining operations. In this case does not apply silence is consent.
B.5 applicant notified of the approval or rejection by publication in the Register Permits and Licenses National.
- Acceptance of applications according to the procedures set out in this decision begins after entry in effect the decision of the Council of Ministers for adoption of the 3-year-old mining and annual mining plan.
- The Ministry of Economy, Trade and Energy, the National Center Licensing, the National Agency of Natural Resources and the Albanian Geological Service implementation of this decision.
This decision shall enter into force after its publication in the Official Journal.
PRIME
Sali Berisha
8654
ANNEX 1
Format description of a mining area of the prospecting permit for the mineral metallic, non-metallic, coal and bitumen; group of construction minerals and group radioactive minerals, drafted by the applicant for a mining permit and has the following contents: For mining area that includes the object (the name of the mining facility), the county (name county / district) involved in open area no. (number of open area declared roadmap Annual mining), published maps of areas open to the mining of the annual plan …
- a) the Company, (name of the company according to the excerpt NRC) with an administrator (name administrator) to address (the address of the company), requires to be provided with the prospecting mining license, for mining area that includes the object (the name of the mining facility) for ore (name / names ore / minerals for which a permit is required), which / who, based on Law No. 10 304, dated
15.07.2010 “On the mining sector in the Republic of Albania” belongs / belong to the group (group minerals).
- b) coordinates state required plan area are in the table below.
Table 1
The coordinates of points required restrictive area
No. Y X
1
2
3
4
- c) the required surface area for exploration is –km2.
- d) the required surface area is owned by (state, local authorities, property private or combination thereof) (this point is met if there is information from the applicant).
- e) topographic map in scale 1:25 000 color configuration significantly surface, table of coordinates state plans to limit points, and the surface
(attached).
The administrator of the company
(Name, surname, signature, stamp)
8655
ANNEX 2
The act of verification for the prospecting permit for the group of metal ores, non-metallic, coal and bitumen; Construction Minerals group and the group of radioactive minerals drafted by the Albanian Geological Service institution and has the following contents:
AKT VERIFICATION
For the prospecting mining license for the group of metal ores, non-metallic, coal and bitumen; Construction Minerals group and the group of radioactive minerals …………………… Date ……………………… pm
Object (the name of the mining facility), oilfield (the name of the oil field / Massif) in the county (name of county / district), including in the open no. (number of open area declared on the map mining annual plan), published in the open area map of annual mining plan year ………
- The company (name of the company according to the excerpt QKR), the manager (name Administrator), address (the address of the company) has realized the demand driven institution Albanian Geological Service on the date (date and time of application of the application as published on the web site of AKBN), for the commission of verification for mining area that includes the object (name mining facility) to obtain the prospecting mining license for ore (name / names of minerals for which a permit is required), which / who, based on Law No. 10 304, dated on 15.07.2010 “On the mining sector in the Republic of Albania” belongs / belong to the group (group minerals).
- The assessment of documentary materials, verification database and field verification The AGS’s specialists, made at random from at least two field engineers kërkimzbulimit minerals that:
- a) The area required for the development of the exploration activity include / (not included) within the framework set out in the map of areas open to the mining of the annual plan …
- b) The coordinates of the area required are as following table.
Table 1
The coordinates of points required restrictive area.
No. Y X
1
2
3
4
- c) They are / (are) in accordance with the request of the subject.
- d) The surface area required for exploration is –km2 and comply / (not in line) at the request of the subject.
- e) the required surface area is / (is not) covered by any other act verification the mining license (if yes, provide the name of the subject, the number and date and time of the request to act verification).
- f) the required surface area is / (there is) previously licensed to kërkimzbulimi activities, use or research and discovery-use (if so, give the name of the subject, the number and date of the issuance).
8656
- g) surface area required (not) overlap with: area (area) licensed ago and where mining permits are active (if so, give the name of the subject, number and date of approval).
- h) The area required (not) related to road infrastructure.
- i) The area required (not) related to electrical infrastructure, telephone and elements
Other.
- j) In the vicinity of the search, which is anticipated to undergo research and discovery (not) They are residential buildings.
- k) different operations of exploration that will take place (there) will have adverse effects on various objects on the surface (if so, give the effect of this activity).
- l) the assessment of the area shows that the area has:
– Natural resources;
– Agricultural land, forests, grasslands;
– Infrastructure works such as road, power lines, hydro, etc .;
– Settlements, socio-cultural objects, artwork, etc., After looking at the area not
They are such;
– Other works protected by law.
- m) within the required area (not) character has detachable monuments, historical cultural heritage, archeology, the geographic or other, which can be damaged by the exercise of mining activities (if yes, provide list the facilities).
- The act of verification will be accompanied by:
- a) Topographic Map scale 1: 25000 color of the surface configuration, table coordinate state plans to limit points, and the surface.
- b) layout of the entities licensed before, or who have applied for verification act of looking around the area for verification act.
- As mentioned above, the entity may (can) continue further procedures to mining permit research and discovery in accordance with Law No. 10 304, dated 07.15.2010 “On the mining sector in the Republic of Albania “and the requirements of this decision.
Verification was conducted by:
Ing.
(name, signature)
Ing.
(name, signature)
Ing.
(name, signature)
Head of the institution
(name, signature, stamp)
Secretary of the technical committee
(name, signature)
Writing Arial, 11.
8657
ANNEX 3
Format description of a mining area of a permit for the mineral exploitation metallic, non-metallic, coal and bitumen; Construction Minerals group, the group of radioactive minerals and permit exploration-exploitation of the mineral precious and semi precious drafted by the mining permit and has the following contents: For mining area that includes the object (the name of the mining facility), the county (name county / district) including in the open no. (number of open area declared roadmap
Annual mining) published maps of areas open to the mining of the annual plan …
- a) Company (name of the company according to the excerpt NRC), the manager (name Administrator), address (the address of the company) requires to be provided with mineral exploitation permits / exploration-exploitation for mining area that includes the object (mining facility’s name) for ore (name / names of ore / minerals for which a permit is required), which / who, based on
Law No. 10 304, dated 15.07.2010 “On the mining sector in the Republic of Albania” respect / belonging to the group (the group of minerals).
- b) coordinates state required plan area are the following table.
Table 1
The coordinates of points required restrictive area.
No. Y X
1
2
3
4
- c) The surface area required for exploitation / exploration-exploitation is –km2.
- d) the required surface area is owned by (state, local authorities, property private or combination thereof) (this point is met if there is information from the applicant).
- e) topographic map in scale 1:25 000 color configuration significantly surface, table of coordinates state plans to limit points, and surface,
(attached).
The administrator of the company
(name, signature, stamp)
8658
ANNEX 4
The act of verifying a license for mineral exploitation permits for mineral group metallic, non-metallic, coal and bitumen; Construction Minerals group, the group of radioactive minerals and permit exploration-exploitation of the mineral precious and semi precious drafted by the institution of the National Agency of Natural Resources and has the following contents:
AKT VERIFICATION
For mineral permits for the group of metallic minerals, non-metallic, coal and bitumen; Construction Minerals group, the group of radioactive minerals and permit exploration-exploitation of precious minerals group and semi-precious
…………………… Date ……………………… pm
Object (the name of the mining facility), oilfield (the name of the oil field / Massif) in the county
(name of county / district), including in the open no. (number of open area declared on the map
mining annual plan), published in the open area map of annual mining plan
year ………
- The company (name of the company according to the excerpt QKR), the manager (name Administrator), address (the address of the company) has realized the demand driven institution Albanian Geological Service on the date (date and time of application of the application as published on the web site of AGS), for the commission of verification for mining area that includes the object (name mining facility) to obtain the prospecting mining license for ore (name / names of minerals for which a permit is required), which / who, based on Law No. 10 304, dated on 15.07.2010 “On the mining sector in the Republic of Albania” belongs / belong to the group (group minerals).
- The assessment of documentary materials, verification database and field verification The SHGJSH’s specialists, made at random from at least two field engineers of searching minerals that:
- a) The area required for the development of the exploration activity include / (not included) within the framework set out in the map of areas open to the mining of the annual plan ………
- b) The coordinates of the area required are as following table.
Table 1
The coordinates of points required restrictive area.
No. Y X
1
2
3
4
- c) They are / (are) in accordance with the request of the subject.
- d) The surface area required for exploration is –km2 and comply / (not in line) at the request of the subject.
- e) the required surface area is / (is not) covered by any other act verification the mining license (if yes, provide the name of the subject, the number and date and time of the request to act
verification).
- f) the required surface area is / (there is) previously licensed to kërkimzbulimi activities, use or research and discovery-use (if so, give the name of the subject, the number and
date of the issuance).
8656
- g) surface area required (not) overlap with: area (area) licensed ago and where mining permits are active (if so, give the name of the subject, number and date of approval).
- h) The area required (not) related to road infrastructure.
- i) The area required (not) related to electrical infrastructure, telephone and other elements.
- j) In the vicinity of the search, which is anticipated to undergo research and discovery (not) they are residential buildings.
- k) different operations of exploration that will take place (there) will have adverse effects on various objects on the surface (if so, give the effect of this activity).
- l) the assessment of the area shows that the area has:
– Natural resources;
– Agricultural land, forests, grasslands;
– Infrastructure works such as road, power lines, hydro, etc .;
– Settlements, socio-cultural objects, artwork, etc., After looking at the area not
They are such;
– Other works protected by law.
- m) within the required area (not) character has detachable monuments, historical cultural heritage, archeology, the geographic or other, which can be damaged by the exercise of mining activities (if yes, provide list the facilities).
- The act of verification will be accompanied by:
- a) Topographic Map scale 1: 25000 color of the surface configuration, table coordinate state plans to limit points, and the surface.
- b) layout of the entities licensed before, or who have applied for verification act of looking around the area for verification act.
- As mentioned above, the entity may (can) continue further procedures to mining permit research and discovery in accordance with Law No. 10 304, dated 07.15.2010 “On the mining sector in the Republic of Albania “and the requirements of this decision.
Verification was conducted by:
Ing.
(name, signature)
Ing.
(name, signature)
Ing.
(name, signature)
Head of the institution
(name, signature, stamp)
Secretary of the technical committee
(name, signature)
Writing Arial, 11.
8657
ANNEX 3
Format description of a mining area of a permit for the mineral exploitation metallic, non-metallic, coal and bitumen; Construction Minerals group, the group of radioactive minerals and permit exploration-exploitation of the mineral precious and semi precious drafted by the mining permit and has the following contents: For mining area that includes the object (the name of the mining facility), the county (name county / district) including in the open no. (number of open area declared roadmap Annual mining) published maps of areas open to the mining of the annual plan …
- a) Company (name of the company according to the excerpt NRC), the manager (name Administrator), address (the address of the company) requires to be provided with mineral exploitation permits / exploration-exploitation for mining area that includes the object (mining facility’s name) for (name / names of minerals for which a permit is required), which / who, based on Law No. 10 304, dated 15.07.2010 “On the mining sector in the Republic of Albania” respect / belonging to the group (the group of minerals).
- b) coordinates state required plan area are the following table.
Table 1
The coordinates of points required restrictive area.
No. Y X
1
2
3
4
- c) The surface area required for exploitation / exploration-exploitation is –km2.
- d) the required surface area is owned by (state, local authorities, property private or combination thereof) (this point is met if there is information from the applicant).
- e) topographic map in scale 1:25 000 color configuration significantly surface, table of coordinates state plans to limit points, and surface, (attached).
The administrator of the company
(name, signature, stamp)
8658
ANNEX 4
The act of verifying a license for mineral exploitation permits for mineral group metallic, non-metallic, coal and bitumen; Construction Minerals group, the group of radioactive minerals and permit exploration-exploitation of the mineral precious and semi precious drafted by the institution of the National Agency of Natural Resources and has the following contents:
AKT VERIFICATION
For mineral permits for the group of metallic minerals, non-metallic, coal and bitumen; Construction Minerals group, the group of radioactive minerals and permit exploration-exploitation of precious minerals group and semi-precious …………………… Date ……………………… pm
Object (the name of the mining facility), oilfield (the name of the oil field / Massif) in the county (name of county / district) including in the open no. (number of open area declared on the map mining annual plan), published in the open area map of annual mining plan year ………
- The company (name of the company according to the excerpt NRC) with an administrator (name Administrator), address (the address of the company) has realized the demand driven institution National Agency of Natural Resources on the date (date and time of application of the application under Publication Site AKBN), for the commission of verification for mining area that includes object (the name of the mining facility) to permit mineral exploitation (or search zbulimishfrytëzim) for ore (name / names of ore / minerals for which the permit), who / to who, based on Law No. 10 304, dated 15.07.2010 “On the mining sector in the Republic of Albania” respect / belonging to the group (the group of minerals).
- The assessment of documentary materials, verification database and field verification specialists AKBN, composed, as the case of at least two engineers in the field of exploitation of minerals that:
- a) The area required for the development of operating activity include / (not included) within the framework set out in the map of areas open to the mining of the annual plan ………
- b) the required coordinates of the area are in the table below.
Table 1
The coordinates of points required restrictive area.
No. Y X
1
2
3
4
- c) They are / (are) in accordance with the request of the subject.
- d) the surface area required for use (or research and discovery-use) is -km2 and compliance / (non-compliant) at the request of the subject.
- e) the required surface area is / (is not) covered by any other act verification the mining license (if yes, provide the name of the subject, the number and date and time of the request to act verification).
8659
- f) the required surface area is / (there is) previously licensed to research activities disclosure, use or disclosure-use search (if so, give the name of the subject, the number and date of the issuance).
- g) surface area required (not) overlap with: area (area) licensed ago and where mining permits are active (if so, give the name of the subject, number and date of approval).
- h) The area required (not) related to road infrastructure.
- i) The area required (not) related to electrical infrastructure, telephone and other elements.
- j) In the vicinity of the search, which is anticipated to undergo exploitation or kërkimzbulimi- use (not) are residential buildings.
- k) different operations or use search and discovery-use that will place (there) will have adverse effects on various objects on the surface (if so, gives the effects of this activity).
- l) the assessment of the area shows that the area has:
– Natural resources;
– Agricultural land, forests, grasslands;
– Infrastructure works such as road, power lines, hydro, etc .;
– Settlements, socio-cultural objects, artwork, etc., After looking at the area not
They are such;
– Other works protected by law.
- m) within the required area (not) there are monuments of a similar nature, historical cultural heritage, archeology, the geographic or other, which can be damaged by the exercise of mining activity (if so, gives, list items).
- The act of verification will be accompanied by:
- a) Topographic Map scale 1: 25000 color configuration of the surface, table coordinate state plans to limit points, and the surface.
- b) layout of the entities licensed before, or who have applied for verification act of looking around the area for verification act.
- c) The layout of the various infrastructure facilities, roads, lines voltage, real cultural heritage, forests, pastures, natural resources or other acts of protected by law.
- As mentioned above, the entity may (can) continue further procedures to mineral exploitation permit or research and discovery-use in accordance with Law No. 10 304, dated 15.07.2010 “On the mining sector in the Republic of Albania” and the requirements of this decision.
Verification was conducted by:
Ing.
(name, signature)
Ing.
(name, signature)
Ing.
(name, signature)
The institution
(name, signature, stamp)
Secretary of the technical committee
(name, signature)