ORDER No.387, dated on 20.05.2011 ON APPROVING THE FORM AND CONTENTS OF THE CONSERVATION PROJECT MINE
ORDER
No.387, dated on 20.05.2011
ON APPROVING THE FORM AND CONTENTS OF THE CONSERVATION PROJECT mine
Pursuant to Article 102, paragraph 4 of the Constitution of the Republic of Albania, Article 55, paragraph 8 and article 56, paragraph 2 of Law No. 10 304, dated 15.07.2010 “On the mining sector in the Republic of Albania”
ORDER:
- All mines abandoned by the provisions of Law No. 10 304, dated 15.07.2010 “On the mining sector in the Republic of Albania”, considered as such, go to conservation and monitoring post-mining regime after evaluation studies National Agency Natural Resources (AKBN) and approval by the Council of Ministers.
- AKBN proposes the mining license areas for conservation, according to a conservation project. This conservation project developed for mining facilities where:
- a) mines are still used by the state geological reserves and exploitation process can proceed by the interested parties;
- b) the continuation of exploitation become ineligible for economic reasons;
- c) the holder of a mining permit for the mining abandoned his reasons, while the activity of mineral exploitation in this object can have economic benefits;
- d) due to geological-mining natural or become ineligible to continue operating and to be guaranteed a new way of exploitation of mining facility.
- The conservation project for the mining permit areas abandoned mines specialized subjects implemented by governmental or private, selected according to procurement procedures, in accordance with the legislation in force.
- Control of the conservation project implementation is carried out by AKBN.
- Procedures conservation a mining abandoned object, made by conservation project approved, pursuant to the provisions of Article 55 of Law No. 10 304, dated 15.07.2010 “On the mining sector in the Republic of Albania”.
- conservation project should be based on the principles of:
- a) protection and conservation works on the object mining and mineral reserves as unique resources.
- b) receipt of preventive and protective measures for the life and health of the communities in the area, pollution in soil, waters, flora and fauna, environment and ecosystem in general, as well as infrastructure.
- c) Consultation with local government authorities.
- d) Coordination between environmental protection and economic development.
- The project of conservation of an abandoned mine, compiled by the National Agency of Natural Resources (AKBN) and approved by the Minister.
- Form and content type of the project of conservation of the mining facility will be under Annex 1 of this order.
- For the implementation of this order charged the institution of the National Agency of Natural Resources (AKBN).
This order comes into force immediately.
MINISTER OF ECONOMY, TRADE AND ENERGY
Nasip Naco
ANNEX 1
FORM AND CONTENTS TIP OF “THE CONSERVATION PLAN” FOR MINING FACILITIES
TEXT CONTENTS
- General Considerations
- i) The justification of the implementation of conservation
- ii) The causes that influence the conservation of the mine
- Information on mining facility
- When the object is abandoned mining by the holder of a mining permit:
- i) Mining area with no identification number, included in annual mining plan approved for the year and no licensed mining permit, dated …. / /
- ii) Name of the holder of the mining permit subject by registration in the QKR:
iii) Type of mineral / minerals:
- iv) Name and surname of the administrator of the subject by registration in the QKR:
- v) Address the subject by registration in the QKR:
- vi) Phone no. / fax:
vii) Name of the local unit / local entities including the required areas:
- When the object is a mine mining abandoned and used by the former state-owned enterprises:
- i) mining area with no identification number
- ii) The name of the state entity that owns the assets of the mining facility
iii) Type of mineral/ minerals
- iv) Phone no./ fax of the state subject:
- v) Name of the local unit / local entities including the required areas:
- The legal basis on which they developed the project, such as:
- a) Decision of the Council of Ministers approves the regime over mining conservation.
- General data Short for mining facility (according to the project of exploitation)
- a) Administrative and topographic location of the facility;
- b) The geography of the area, the landscape, vegetation, fauna, ecosystem in general, etc .;
- c) Construction and oil field geological region;
- d) The type and thickness of the land cover in the mining area;
- e) Tectonics oil field;
- f) Hydrographic and hydrogeological conditions the source. Types of water and their chemistry process;
- g) On the morphology and composition of ores and / or useful ores. Short data on the type of mineral t, physico-chemical properties of it.
- In the case of underground exploitation of oil field
- a) Description of the way the opening of the mine, the opening main proceedings, the amount and type of water arising from mining work, the amount of sterols and mineral composition, the location of the storage sites, the waste processing and recycling;
- b) The operating system used and the technical and economic indicators achieved, quantity and quality of reserves used or may be used, separated by horizons and profiles;
- c) Description of the surface facilities, such as roads, wells, offices, showers and toilets, wardrobe, dormitory, canteen, warehouse materials, compressor room, electrical cabinets, pumping station, workshops, warehouses and explosive materials and other facilities.
- In the case of the source usage career
- a) Description of options of opening the roads and gjysmëtrasheve, their length and section. Determining the actual boundaries of career, its real dimensions, determining the coordinates of Vertex, amount and type of water flowing into a career and that of her, the location of waste disposal sites, the location of processing plants and recycling;
- b) The operating system that is used and the technical and economic indicators achieved, quantity and quality of reserves used or may be used separately under horizons and profiles;
- c) Description of the surface facilities, such as roads, wells, offices, showers and toilets, wardrobe, dormitory, canteen, warehouse materials, compressor room, electrical cabinets, pumping station, workshops, warehouses and explosive materials and other facilities.
- Inventory of investments made in the mining facility
- a) Approved the actual physical inventory;
- b) Inventory of basic works, preparation and exploitation;
- c) Inventory Accounting (approved by the balance sheet);
- d) List of machinery and technological equipment.
- Forecast of way and conservation of mining operations:
In the case of mining facilities, where it is used underground exploitation:
- a) Closing of the opening mouths of mine works with gate;
- b) Administrative area and the Siege of industrial and hazardous areas;
- c) Establishment of warning signs and stop;
- d) Determining the guardhouse and the relevant personnel;
- e) Determine the plan and schedule control and service of equipment and machinery in underground and surface;
- f) Determine the plan and schedule control and service of industrial buildings and facilities socio-cultural service;
- g) Determine the plan and schedule to test the technical readiness of machinery and equipment;
- h) Determination of the necessary number of employees for the period preservation and conservation service.
In the case of mining facilities which is used Quarrying:
- a) Closure and / or blocking roads, thick or career gjysmëtrasheve entry;
- b) The Siege of space and / or spaces created by Quarrying;
- c) Establishment of warning signs and stop;
- d) Determining the guardhouse and the relevant personnel;
- e) Determine the plan and schedule control and service of equipment and machinery in the area;
- f) Determine the plan and schedule control and service of industrial buildings and facilities socio-cultural service;
- g) Determine the plan and schedule to test the technical readiness of machinery and equipment;
- h) Determination of the necessary number of employees for the period preservation and conservation service.
- The estimates are detailed and specified for each operation for the conservation of the mining facility.
- Conclusions and recommendations.
- PART GRAPHIC
Denomination Rate No.
- For underground mines
- Map of the area topographic coordinates mining facility 1: 25000
- General layout of the opening proceedings (the date of the final state) 1: 5000 or 1: 2000 or 1: 1000 or 1: 500
- The plan of establishing administrative buildings, social-cultural and industrial (Updated with final status) 1: 500 or 1: 200
- Layout, placement scheme lot plan copy and machinery equipment in underground and surface 1: 500 or 1: 200
- Passports closure of main mine workings 1: 500 or 1: 200
6 .Scheme of siege and establishment of preventive signs 1: 500 or 1: 200
- Career
- Map of the area topographic coordinates mining facility 1: 25000
- General layout of the career at the end of use, updated with final state 1: 1000 or 1: 2000 or 1: 500
- Topographical and geological map of the facility with the opening streets and squares of deposit of sterols or products, with the final state 1: 5000 or 1: 2000 or 1: 1000 or 1: 500
- Plan of establishing administrative buildings, social-cultural and industrial and schemes of placing machinery and equipment working in the square of 1: 100, 1: 200 or schematic with parameters
- Passports closure of roads in career 1: 500 or 1: 200
- Scheme of enclosures space career and establishing preventive signs 1: 500 or 1: 200